Contents

  • Cover
  • Front matter
  • Introduction
  • Identifying and managing risk
    • Risk overview
    • Working smart and efficiently
    • Starting the job – be prepared
    • The job is not finished until it is signed-off
  • Basics
    • Roading terms
    • Basics about soil
  • Good construction
    • A well-constructed road
    • A well-constructed landing
  • Earthworks
    • The right machine for the task
    • Clearing and stripping
    • Cut and side cast construction
    • Cut and bench fill construction
    • Full bench construction with end-haul
    • Earthworks compaction
    • Landing construction
    • Forming road corners and in-bends
    • Final grading before metalling
    • Stabilising cut/fill slopes
  • Water control
    • Water control overview
    • Ditches
    • Road drainage culverts
    • Berms and cut-outs
    • Flumes
    • Silt traps and soak holes
    • Silt fences
    • Single culvert river crossings
    • Ford crossings
    • Bridges
  • Applying aggregate (metalling)
  • Repairs and maintenance
    • R&M overview
    • R&M common to new construction
    • R&M of road formation
    • R&M during harvesting operations
    • R&M of river crossings
  • Assisting loggers and harvesting rehab
    • Installing deadmen
    • Installing debris traps
    • Harvesting track rehabilitation (rehab)
    • Harvesting track rehabilitation – cut-outs
    • Landing rehab
  • Want to learn more?
  • Glossary

NZ Forest Road Engineering Manual: Operators Guide

  1.  ›
  2. Basics ›
  3. Roading terms
 

Roading terms

The Operators Guide uses some of the following terms. Supervisors, planners, and engineers who visit your site are likely to use them.

Common roading terms
Common roading terms
Table 4: Measuring road or slope steepness
Prev page Next page
Forest Owners Association

© 2023 New Zealand Forest Owners Association

Website by RS